Telangana is a state in the Southern region of India. It has an area of 114,840 km2 and is the twelfth largest state in India. Most of it was part of the princely state of Hyderabad, ruled by the Nizam of Hyderabad during the British Raj, joining the Union of India in 1948. Telangana was separated from Andhra Pradesh as a new 29th state of India, with the city of Hyderabad as its capital. Hyderabad will continue to serve as the joint capital city for Andhra Pradesh and Telangana for a period of not more than ten years. Telangana is situated on the Deccan Plateau, in the central stretch of the eastern seaboard of the Indian Peninsula. It covers 114,800 square kilometers (44,300 sq. mi). The region is drained by two major rivers, with about 79% of the Godavari River catchment area and about 69% of the Krishna River catchment area, but most of the land is arid. Telangana region has rich natural resources. About 45 per cent of the forest area in Andhra Pradesh state is in Telangana region while 20 per cent of the country's coal deposits in the country are also found here. Telangana is also rich in limestone deposits that cater to cement factories. Telangana has other mineral resources like bauxite and mica. Perennial rivers Godavari and Krishna enter Andhra Pradesh in Telangana before flowing down through other regions and ending up in the Bay of Bengal. Telangana region is sitting on potential oil and natural gas reserves, according to a report by Director General of Hydrocarbons (DGH). Telangana has a significant amount of Software export in India. While majority of the Industry is concentrated over Hyderabad, the other cities are also becoming significant IT destinations in the state. Hyderabad's IT exports exceeded $7 billion in 2014.There have been extensive investments in digital infrastructure.

 

AGRICULTURE

Rice is the major food crop and staple food of the state. Other important crops are tobacco, mango, cotton and sugar cane. Agriculture has been the chief source of income for the state's economy. Important rivers of India are the Godavari, Krishna flow through the state, providing irrigation. Telangana agriculture department separated from Andhra Pradesh as part of Andhra Pradesh bifurcation It aims promote agricultural trade and to boost up the agricultural production and productivity in the Telangana.

 

TOURISM IN TELANGANA

Telangana State Tourism Development Corporation (TSTDC) is a state government agency which promotes Tourism in Telangana. Telangana has a variety of tourist attractions including historical places, monuments, forts, water falls, forests and temples. Charminar, Golconda Fort, QutbShahi Tombs, Chowmahalla Palace, Falaknuma Palace and Bhongir Fort, are some of the monuments in the state. The Charminar, built in 1591 CE, is a monument and mosque located in Hyderabad, Telangana, India.

 

DEMOGRAPHIC PROFILE

Telangana with a population of 351.9 lakhs (according to the 2011 census) accounts for about 3.6% percent of the total population of India. Out of this, 177.0 lakhs (50.2%) are males and 174.9 lakhs (49.8%) are females. The sex ratio of the state is 988 as against the national figure of 943. The population density in the state is 307 persons/Sq.Km. In 2012-13, the services sector at Rs.  1, 14,046 crores, contributed 58.1% to the GSDP (at constant prices). It is followed by industry sector, contributing 27.9% (Rs. 54,687 crores) and the agriculture sector’s contribution of 14% (Rs. 27,450 crores). The services sector had fastest growth  of  11.31%  followed  by  industry  sector  (10.04%)  and  agriculture  sector  (6.89%) between 2004-05 and 2012-13.

The Telangana government has proposed to add 230 crore plants in the next three years under a flagship programme which envisages boosting of tree cover in the state by nearly 8%.

 

FOOD AND INDUSTRIAL PROCESSING SECTOR

The Telangana government plans to put greater emphasis on value-addition in the farm sector in its industrial policy. The departments of industry and commerce, agriculture and agro marketing would coordinate together to achieve value maximization for farmers. The government is also keen on encouraging e-marketing activities, which involves networking all agriculture mandis in the state so that farmers get access to prevailing prices across important markets and thereby helping them unlock the right value for their produce. The state in collaboration with research institutes in the country would facilitate an ideal adoption of latest practices ranging from seed technology and farm machinery to improve farm productivity. the state government is also considering specific projects such as setting up a pharmaceutical city near Hyderabad and a cotton hub in Warangal district, the largest producer of long-staple cotton. The Telangana government has begun a survey to identify land that can be offered to new industries in the state. The Telangana government is set to announce its new industrial policy under which scheduled castes and scheduled tribe entrepreneurs would be specially encouraged.

Telangana Government is mulling to set up a 'Pharma City' near the state capital in about 8,000 acres. The City will include industries as well as residential colony, and a power plant with 500 MW capacity will be set up adjacent to the pharma city to provide captive, dedicated and uninterrupted power supply to the industry. The pharma city is expected to accommodate about five lakh employees besides their families in the residential colony touching about twenty lakh over a period. Delegation of Drugs Manufacturers' Association that an international consultancy organisation with expertise in developing in the information technology and pharmaceuticals manufacturing sectors may become backbone of Telangana economy, leaving power production, ports and oil and natural gas to play a pivotal role in driving prosperity in the residuary state. Industrial estates should be contacted to design the pharma city. Telangana's per capita income of Rs 24,409 in 2004-05 has phenomenally grown to a whopping Rs 83,020. While Hyderabad has less number of households using open toilets at 0.9 per cent, Mahabubnagar is at 71.1 per cent. The land-locked state is expected to have nearly Rs 4,000 crore surplus budget, but lingering power deficit may force the new government to spend more on the power purchase. Telangana, spread in 1,14,840 square kilometres, has 66.46 per cent literacy rate with a population of 3.52 crore.

 

ECONOMY OF TELAGANA

The Economy of Telangana is mainly driven by agriculture. Two important rivers of India, the Godavari and Krishna, flow through the state, providing irrigation. Rice, cotton, mango and tobacco are the local crops. Recently, crops used for vegetable oil production such as sunflower and peanuts have gained favour. There are many multi-state irrigation projects in development, including Godavari River Basin Irrigation Projects and NagarjunaSagar Dam, the world's highest masonry dam. Telangana is a mineral-rich state, with coal reserves at SingaerniColleries. The population of Telangana is over 35 million now – much more than 30 million for the whole of Andhra Pradesh, including Telangana, at the time of its formation in 1956. The demands on governance have multiplied over this half a century. Apart from commitment to the development of the region, a smaller state being more easily accessible to the common people can intelligently and speedily grapple with their problems.

 

INDUSTRIAL POLICY FRAMEWORK FOR STATE OF TELANGANA

Industrialization will be the key strategy followed for economic growth and development for Telangana, the 29th state of the country. People of the new state have very high expectations from the Telangana State Government for creating jobs for the youth, promote development of backward areas, maximize growth opportunities by optimum utilization of the available resources, harness the talents and skills of the people etc. The Government of Telangana State realizes that industrial development requires large-scale private sector participation, with the government playing the role of a facilitator and a catalyst. The government is committed to provide a graft-free, hassle-free environment in which the entrepreneurial spirit of local, domestic and international investors will thrive to take up their industrial units in the state of Telangana as the preferred investment destination.

The new Telangana State Industrial Policy will be rooted in certain core values, as follows:

 

                • The Government regulatory framework shall facilitate industrial growth

                • Entrepreneurs will thrive in a peaceful, secure and progressive business regulatory                                        environment

                • Industrial development will lead to massive creation of jobs benefitting local youth

                • Industrialization shall be inclusive and facilitate social equality

 

The new Telangana State Industrial Policy will strive to provide a framework which will not only stabilize and make existing industries more competitive, but also attract and realize new international and national investments in the industrial sector. It is expected that the most significant outcome of this approach will be the production of high quality goods at the most competitive price, which establishes “Made in Telangana-Made in India” as a brand with high global recognition. The Industrial Policy Framework has the following mandate for departments that have any responsibility in the industrialization of the State—Minimum Inspection and Maximum Facilitation.

The Government of Telangana State is determined to create an ecosystem in which the ease of doing business in the state matches and even exceeds the best global standards. Telangana State Government is aware that offering a hassle-free system is considered to be of the highest priority by the industrialists, and accordingly the government will implement a very effective industrial clearance system that will go beyond the traditional single window system.

 

THRUST AREAS AND CORE SECTORS

•             Life Sciences including, bulk drugs, formulations, vaccines, nutraceuticals, biological,   incubation centers, R&D facilities and medical equipment.

•             IT Hardware including bio-medical devices, electronics, cellular communications.

•             Precision engineering, including aviation, aerospace, defence.

•             Food processing and nutrition products including dairy, poultry, meat and fisheries.

•             Automobiles, Transport Vehicles, Auto-components, Tractors and Farm Equipment.

•             Textiles and Apparel, Leather and leather value added products like shoes, purses, bags,         artificial   material infused and coated textiles, paper and paper products.

•             Plastics and Polymers, Chemicals and Petro-chemical, glass and ceramics.

•             FMCG and Domestic Appliances.

•             Engineering and Capital Goods, including castings, foundry and Ferro-alloys and other    metallurgical industries.

•             Waste Management and Green Technologies.

•             Renewable Energy and Solar Parks.

•             Mineral-based and wood-based Industries.

•             Transportation/Logistic Hub/Inland Port/Container Depot.

 

Telangana has emerged as a State that provides that right climate for the growth of IT business and is now one of the most preferred destinations in the Country.

The State of Telangana is poised towards creating a benchmark in Information & Communication Technology (ICT) endowed with a high quality state-of-the-art physical & communication infrastructure of international standards, harnessed human resources, and proactive business friendly policies of the Government.

It is estimated that about 20 lakh acres of land is available in the state that has been identified as unfit for cultivation in Telangana. Based on a detailed survey of these land parcels and identification of those parcels that are fit for industrial use, an industrial land bank for the State of Telangana will be developed.

The development of industrial and related infrastructure will be the responsibility of the Telangana State Industrial Infrastructure Corporation (TSIIC). The financial base of the TSIIC will be strengthened and it will be made to function as an effective organization. All lands in the State identified as fit for industrial use will be transferred to the TSIIC.

To support industrialization, the Government of Telangana will earmark 10% of water from all existing and new irrigation sources for industrial use. Water pipelines will be laid as a part of infrastructure creation for each industrial park by TSIIC. The Government of Telangana State recognizes that quality power and uninterrupted power supply are keys to the growth of the industrial sector. The State has a clear short-, medium-, and long-term plans to first overcome the power shortage and eventually become a power surplus state. Accordingly, uninterrupted power supply will be arranged in each industrial park. The Telangana State Government will encourage usage of non-conventional energy for industrial purposes.

The Telangana State Government is committed to encourage the process of industrialization by making various kinds of incentives available to the entrepreneurs. The Telangana State Government also assures an entrepreneur-friendly and graft-free regime of disbursing the incentives. The Telangana State Government will consider providing incentives to the entrepreneurs in the following areas-

•             Stamp duty reimbursement

•             Land conversion cost

•             Investment subsidy

•             VAT reimbursement

•             Interest subsidy

•             Clean production measures

•             Reimbursement of infrastructure development costs etc.

A sound industrial policy has to ensure that the state taxation structure is conducive to industrial growth and state financial resource augmentation. Distortions in the tax structure leads to evasion of taxes and clandestine transport of industrial inputs and outputs to neighbouring states, which may have advantageous tax rates. The presence of important national and state highways, coupled with the availability of resources and opportunities, provides a great potential for development of industrial corridors in the state along these roadways.

The Industrial Corridors that will be developed initially will be:

 

1) Hyderabad-Warangal Industrial Corridor

2) Hyderabad-Nagpur Industrial Corridor

3) Hyderabad-Bengaluru Industrial Corridor

The new Industrial Policy brought out by the Government of Telangana promises to revolutionise the way industrial sector has been viewed by successive governments in this country. A day is not far when the new Industrial Policy of Telangana will shine as an exemplar among the best in the world.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Biodegradable Plastic Bags from Corn Starch
Biodegradable Plastic Bags from Corn Starch

Corn starch has 25% amylose and 75% amylopectin. The amylose molecules loose lose water increase biodegradation charac... Read More

Capacity : Biodegradable Plastic Bags (Per Bag 25 gms Size): 12 MT per day
Plant and Machinery cost: 1053.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 1498.00Lakhs
Add To Inquiry Basket
Manufacturing of Dextrose Anhydrous, Sorbitol & Vitamin C. Investment Opportunities in Pharma Sector.
Manufacturing of Dextrose Anhydrous, Sorbitol & Vitamin C. Investment Opportunities in Pharma Sector.

Manufacturing of Dextrose Anhydrous, Sorbitol & Vitamin C. Investment Opportunities in Pharma Sector. Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
White Oats Processing
White Oats Processing

White Oats Processing. Profitable Business Opportunities in Oat Based Products. Oatme... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing of Vermicompost and Organic Manure
Manufacturing of Vermicompost and Organic Manure

Manufacturing of Vermicompost and Organic Manure. Profitable Investment in Organic Natural Plant Nutrient Indust... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Maize and It’s By Products (Maize Starch, Sorbitol, Liquid Glucose, Dextrose Monohydrate, Dextrose Anhydrous, Gluten and Maltodextrin)
Maize and It’s By Products (Maize Starch, Sorbitol, Liquid Glucose, Dextrose Monohydrate, Dextrose Anhydrous, Gluten and Maltodextrin)

Maize also known as corn is a cereal grain. Maize has become a staple food in many parts of the world, with total prod... Read More

Capacity : Maize Starch: 50 MT per day Sorbitol : 8.5 MT per day Liquid Glucose: 8.5 MT per day Dextrose Monohy
Plant and Machinery cost: 4670.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 6631.00Lakhs
Add To Inquiry Basket
Manufacturing of Biomass Briquettes from Biowaste.
Manufacturing of Biomass Briquettes from Biowaste.

Manufacturing of Biomass Briquettes from Biowaste. Profitable Investment in Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing of Black Pepper Essential Oil
Manufacturing of Black Pepper Essential Oil

Manufacturing of Black Pepper Essential Oil. Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
3 Star Hotel with 2 Banquet Hall & Restaurant
3 Star Hotel with 2 Banquet Hall & Restaurant

A hotel is an establishment that provides Read More

Capacity : Air conditioned Deluxe Rooms:32 Units per day Conference Hall, Meeting Rooms & Business Lounge:0.5
Plant and Machinery cost: 150.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):30.00 %
TCI :0.00 Lakhs
Cost of Project : 1014.00Lakhs
Add To Inquiry Basket
Workshop for Motors of Low Voltage (Up-To 1000V) and Distribution Transformers (Maintenance, overhauls and repairs)
Workshop for Motors of Low Voltage (Up-To 1000V) and Distribution Transformers (Maintenance, overhauls and repairs)

Maintenance of electrical equipment and the maintenance function in general, are key subjects ... Read More

Capacity : Repair & Maintenance Motors (100 KW):2 Units per day On Site Annual Maintenance Contract (AMC):0.8 U
Plant and Machinery cost: 22.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):72.00 %
TCI :0.00 Lakhs
Cost of Project : 76.00Lakhs
Add To Inquiry Basket
PVC Wires and Cables
PVC Wires and Cables

An electrical cable is an assembly of one or more wires running side by side or bundled, which is used to carry electr... Read More

Capacity : PVC Coated Copper Wires (100 Mtrs Rolls):33,784 Nos. per annum PVC Coated Aluminium Wires (100 Mtrs
Plant and Machinery cost: 195.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 1568.00Lakhs
Add To Inquiry Basket
Start your own industry of Synthetic camphor Production.
Start your own industry of Synthetic camphor Production.

Start your own industry of Synthetic camphor Production. Profit-Making Project for En... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Profitable Surgical Face Mask Industry.
Start Profitable Surgical Face Mask Industry.

Start Profitable Surgical Face Mask Industry. Money Making Business Ideas in production of Me... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing of  Disposable Personal Protective Equipment (PPE) Kit
Manufacturing of Disposable Personal Protective Equipment (PPE) Kit


The purpo... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Ayurvedic Herbal Hand Sanitizer
Ayurvedic Herbal Hand Sanitizer
Hand hygiene is the best tool in preventing opportunistic infections caused by different micro organisms and to achieve this, the use of hand sanitize... Read More
Capacity : 1
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Liquid Hand Wash
Liquid Hand Wash
Hands are primary mode of transmission of microbes and infections. Hand-washing is critical in food production, food service and also important in ... Read More
Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
A Business Plan For Sanitary Napkins
A Business Plan For Sanitary Napkins

A sanitary napkin, also kno... Read More

Capacity : Sanitary Napkins 4,800 PKTS per day
Plant and Machinery cost: 26.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 84.00Lakhs
Add To Inquiry Basket
Start Manufacturing Of Blood Collection Tubes (Vacutainer)
Start Manufacturing Of Blood Collection Tubes (Vacutainer)

Blood collection tubes, also known as Vacutainer, are essential tools used in the med... Read More

Capacity : -
Plant and Machinery cost: 464.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 985.00Lakhs
Add To Inquiry Basket
Start Production Of Potato Flakes
Start Production Of Potato Flakes

Capacity : Potato Flakes 2 MT Per Day
Plant and Machinery cost: 178.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 563.00Lakhs
Add To Inquiry Basket
Setup Manufacturing Unit Of Bicycle Saddle & Pedals
Setup Manufacturing Unit Of Bicycle Saddle & Pedals

Bicycle saddles and pedals are two crucial components that di... Read More

Capacity : Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day
Plant and Machinery cost: 208.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 575.00Lakhs
Add To Inquiry Basket
Opportunity in Sodium Sulfide Flakes Business From Sulfur and Caustic Soda
Opportunity in Sodium Sulfide Flakes Business From Sulfur and Caustic Soda

Sodium Sulfide Flakes, scie... Read More

Capacity : Sodium Sulfide Flakes 10,000 MT Per Annum
Plant and Machinery cost: 282.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 1426.00Lakhs
Add To Inquiry Basket
Business Plan for Lithium Ion Battery (Battery Assembly)
Business Plan for Lithium Ion Battery (Battery Assembly)

A lithium ion battery (Battery Assembly) is a rechargeable battery that is typically ... Read More

Capacity : -
Plant and Machinery cost: 172.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):61.00 %
TCI :0.00 Lakhs
Cost of Project : 812.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business of Steel Containers (Cargo Containers)
Start Manufacturing Business of Steel Containers (Cargo Containers)


Read More

Capacity : Cargo Containers (Size 20 Feet) 34 Nos Per Day
Plant and Machinery cost: 272.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 1992.00Lakhs
Add To Inquiry Basket
Start Cutting and Grinding Disc Business
Start Cutting and Grinding Disc Business

 

Cutting and grind... Read More

Capacity : Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day
Plant and Machinery cost: 141.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 423.00Lakhs
Add To Inquiry Basket
Mink Blankets Production
Mink Blankets Production

 

Mink blankets, de... Read More

Capacity : -
Plant and Machinery cost: 2700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):42.00 %
TCI :0.00 Lakhs
Cost of Project : 6000.00Lakhs
Add To Inquiry Basket
A Business Plan for Micronutrient Fortified Energy Dense Food (Rice Based)
A Business Plan for Micronutrient Fortified Energy Dense Food (Rice Based)

 

Micronutrient For... Read More

Capacity : Micronutrient Fortified Energy Dense Food 100 MT Per Day
Plant and Machinery cost: 1300.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 3500.00Lakhs
Add To Inquiry Basket
Start Business of Caustic Soda (Solids, Liquids, Flakes & Pearls)
Start Business of Caustic Soda (Solids, Liquids, Flakes & Pearls)


Read More

Capacity : -
Plant and Machinery cost: 29000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):33.00 %
TCI :0.00 Lakhs
Cost of Project : 56500.00Lakhs
Add To Inquiry Basket
Start Crumb Rubber Powder Business from Waste Tyre (with Shredding Process)
Start Crumb Rubber Powder Business from Waste Tyre (with Shredding Process)

Crumb Rubber Powder represents a finely milled material produ... Read More

Capacity : Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day
Plant and Machinery cost: 97.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 303.00Lakhs
Add To Inquiry Basket
Start a Production Of Compressed Biogas
Start a Production Of Compressed Biogas

Compressed bio gas (CBG) is a renewable energy source produced from organic material such as agricultural... Read More

Capacity : Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day
Plant and Machinery cost: 172.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 522.00Lakhs
Add To Inquiry Basket
Start Industry Of Craft Beer
Start Industry Of Craft Beer

Craft beer is a term used to describe a beer that has been made in a traditional and independent fashion. It is usually made in smaller batches wit... Read More

Capacity : Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot
Plant and Machinery cost: 780.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 2007.00Lakhs
Add To Inquiry Basket
Setup plant of  Acetate Tow  for Cigarette Filters
Setup plant of Acetate Tow for Cigarette Filters

Acetate tow is a type of material used in the cigarette industry to make filters. It is made of cellulose acet... Read More

Capacity : Acetate Tow 8 MT Per Day
Plant and Machinery cost: 542.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 1426.00Lakhs
Add To Inquiry Basket
Setup Plant  Of Titanium Dioxide From Rutile Ilmenite Ore
Setup Plant Of Titanium Dioxide From Rutile Ilmenite Ore

Titanium dioxide from rutil... Read More

Capacity : Titanium Dioxide 4 MT Per Day
Plant and Machinery cost: 390.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 1455.00Lakhs
Add To Inquiry Basket
Setup Plant Of  Lab Cultured Diamonds From Graphite
Setup Plant Of Lab Cultured Diamonds From Graphite

Lab-cultured diamonds are quickly becoming the new standard for luxury jewelry, offering many of the same qualities as trad... Read More

Capacity : Lab Cultured Diamonds (1 Carat) 30 Carat Per Day
Plant and Machinery cost: 200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 361.00Lakhs
Add To Inquiry Basket
Start Lemon Processing Unit (Lemon Juice Powder, Lemon Peel Oil, Lemon Pectin)
Start Lemon Processing Unit (Lemon Juice Powder, Lemon Peel Oil, Lemon Pectin)

Lemon processing is the pro... Read More

Capacity : Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs
Plant and Machinery cost: 163.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 314.00Lakhs
Add To Inquiry Basket
Solar PV (Photovoltaic) Glass Industry Manufacturing Business
Solar PV (Photovoltaic) Glass Industry Manufacturing Business

The global energy transition towards renewable sources is well underway, and solar po... Read More

Capacity : Solar PV (Photovoltaic) Glass 90,000 MT Per Annum
Plant and Machinery cost: 2800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):69.00 %
TCI :0.00 Lakhs
Cost of Project : 4200.00Lakhs
Add To Inquiry Basket
A Business Plan For Pea Protein Isolate or Concentrate
A Business Plan For Pea Protein Isolate or Concentrate

Yellow peas are the source of the pea protein isolate and concentrate. These goods of... Read More

Capacity : Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day
Plant and Machinery cost: 118.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 614.00Lakhs
Add To Inquiry Basket
Setup Plant  Of  Acrylate Resins and Emulsions
Setup Plant Of Acrylate Resins and Emulsions

An important class of materials that have acquired extensive application in numerous ... Read More

Capacity : Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum
Plant and Machinery cost: 500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 2291.00Lakhs
Add To Inquiry Basket
Start Latex Rubber Thread Manufacturing Business
Start Latex Rubber Thread Manufacturing Business

A sort of elastic material created from either natural rubber... Read More

Capacity : Latex Rubber Thread 200 Kg. Per Day
Plant and Machinery cost: 145.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):53.00 %
TCI :0.00 Lakhs
Cost of Project : 412.00Lakhs
Add To Inquiry Basket
Start Cosmetic Unit (Serum, Cream, Shampoo & Lipstick) Manufacturing Business
Start Cosmetic Unit (Serum, Cream, Shampoo & Lipstick) Manufacturing Business

Serum, cream, shampoo, and lipstick are frequently seen in cosmetic units, which are ... Read More

Capacity : -
Plant and Machinery cost: 46.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):36.00%
Break Even Point (BEP):37.00 %
TCI :0.00 Lakhs
Cost of Project : 1617.00Lakhs
Add To Inquiry Basket
Pioneering Pea Protein Building a Successful Business Venture
Pioneering Pea Protein Building a Successful Business Venture

Healthy protein powder called pea healthy protein isolate/con... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Production Of Silica  From Rice Husk Ash
Start Production Of Silica From Rice Husk Ash

Silica is a mineral compound composed of silicon and oxygen, and is one of the most a... Read More

Capacity : -
Plant and Machinery cost: 2995.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 4716.00Lakhs
Add To Inquiry Basket
A Business Plan for IV Fluid (BFS Technology)
A Business Plan for IV Fluid (BFS Technology)

 

IV fluids, also k... Read More

Capacity : IV Fluids (500 ml Size Pack) 78,000 Packs Per Day
Plant and Machinery cost: 744.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):51.00 %
TCI :0.00 Lakhs
Cost of Project : 1263.00Lakhs
Add To Inquiry Basket
Start Industry of Liquor from Mahua (Wine and Hard Liquor)
Start Industry of Liquor from Mahua (Wine and Hard Liquor)

Mahua is a tropical tree native to the Indian subcontinent and Southeast Asia. It is ... Read More

Capacity : Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B
Plant and Machinery cost: 782.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 1880.00Lakhs
Add To Inquiry Basket
Setup Pharmaceutical Unit (Ciprofloxacin Tablets, Co-Trimoxazole Tablets, Diclofenac Sodium Tablets, Paracetamol Tablets, Metronidazole Tablets, Doxycycline Tablets, Fluconazole Capsules, Propranolol Capsules, Ciprofloxacin Injectables) Plant
Setup Pharmaceutical Unit (Ciprofloxacin Tablets, Co-Trimoxazole Tablets, Diclofenac Sodium Tablets, Paracetamol Tablets, Metronidazole Tablets, Doxycycline Tablets, Fluconazole Capsules, Propranolol Capsules, Ciprofloxacin Injectables) Plant

 

Pharmaceutical unit tablets and capsules are c... Read More

Capacity : -
Plant and Machinery cost: 179.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.00%
Break Even Point (BEP):29.00 %
TCI :0.00 Lakhs
Cost of Project : 35774.00Lakhs
Add To Inquiry Basket
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo
Start Industry with Serum, Cream, and Shampoo | Turning Your Passion for Cosmetics into a Thriving Business with Serum, Cream, and Shampoo

Why The Beauty Indu... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Setup Unit Of Cement Plant with Power Generation
Setup Unit Of Cement Plant with Power Generation

Cement is a crucial binding agent that is use... Read More

Capacity : Cement Plant 40,000 Bags per Day
Plant and Machinery cost: 16500.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):44.00 %
TCI :0.00 Lakhs
Cost of Project : 25200.00Lakhs
Add To Inquiry Basket
A Business Plan for Sterile Water for Injection
A Business Plan for Sterile Water for Injection

Sterile water refers to water that is completely free from any living organisms, such... Read More

Capacity : Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day
Plant and Machinery cost: 572.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 1234.00Lakhs
Add To Inquiry Basket
Setup Plant Of Lead From Galena
Setup Plant Of Lead From Galena

Lead is a heavy metal that is commonly found in the earth's crust. Its abundance, low... Read More

Capacity : Lead Ingot 30 MT Per Day
Plant and Machinery cost: 487.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):52.00 %
TCI :0.00 Lakhs
Cost of Project : 2231.00Lakhs
Add To Inquiry Basket
A Business Plan Blood Collection Tubes, Urine and Stool Containers
A Business Plan Blood Collection Tubes, Urine and Stool Containers


Read More

Capacity : -
Plant and Machinery cost: 1214.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 2294.00Lakhs
Add To Inquiry Basket
A Business Plan for Paracetamol
A Business Plan for Paracetamol

Paracetamol is a popular over-the-counter pain reliever and f... Read More

Capacity : Paracetamol Powder 7 MT Per Day
Plant and Machinery cost: 274.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 779.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business  Of  Baby & Adult Diaper and Sanitary Napkins
Start Manufacturing Business Of Baby & Adult Diaper and Sanitary Napkins

Baby & Adult Diapers an... Read More

Capacity : Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary
Plant and Machinery cost: 2356.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 4201.00Lakhs
Add To Inquiry Basket
Start Tissue Paper Manufacturing Business
Start Tissue Paper Manufacturing Business

Tissue paper is a lightweig... Read More

Capacity : Tissue Paper 20 MT Per Day
Plant and Machinery cost: 497.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 2101.00Lakhs
Add To Inquiry Basket
Launching a  Solar Panel Production Business
Launching a Solar Panel Production Business

 

Solar panels are ... Read More

Capacity : Solar Panel 500 MW per annum
Plant and Machinery cost: 810.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):32.00%
Break Even Point (BEP):56.00 %
TCI :0.00 Lakhs
Cost of Project : 5353.00Lakhs
Add To Inquiry Basket
Biodegradable Disposable Cups and Plates (Tableware) Manufacturing Using Sugarcane Bagasse Business
Biodegradable Disposable Cups and Plates (Tableware) Manufacturing Using Sugarcane Bagasse Business

Bagasse is the fibrous residue that remains after sugarcane o... Read More

Capacity : -
Plant and Machinery cost: 1941.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):46.00 %
TCI :0.00 Lakhs
Cost of Project : 2774.00Lakhs
Add To Inquiry Basket
Setup Curcumin Extraction Plant
Setup Curcumin Extraction Plant

Curcumin extraction refers to the process of isolating and ex... Read More

Capacity : Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs
Plant and Machinery cost: 216.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 491.00Lakhs
Add To Inquiry Basket
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit
Setup Active Pharmaceutical Ingredients Acetaminophen, Metformin Hydrochloride, Azithromycin Dihydrate Unit

 

Active Pharmaceut... Read More

Capacity : Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs
Plant and Machinery cost: 1111.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 5246.00Lakhs
Add To Inquiry Basket
PSA Oxygen Plant
PSA Oxygen Plant

 

PSA p... Read More

Capacity : 30 to 36 cylinders per day
Plant and Machinery cost: 45.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
PSA Oxygen Gas Plant
PSA Oxygen Gas Plant

PSA plants take... Read More

Capacity : 180 to 200 cylinders per day
Plant and Machinery cost: 99.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production Business of Razor Blade for Safety Razor and Disposable Safety Razor
Production Business of Razor Blade for Safety Razor and Disposable Safety Razor

 

The double-edged ... Read More

Capacity : Disposable Safety Razors: 864,000 Units per Day Razor Blade: 172,800 Units per Day Steel Scrap: 500
Plant and Machinery cost: 467.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.51%
Break Even Point (BEP):43.43 %
TCI :0.00 Lakhs
Cost of Project : 2285.00Lakhs
Add To Inquiry Basket
Investing into Business of Ductile Iron Pipe FittingsInvesting into Business of Ductile Iron Pipe Fittings
Investing into Business of Ductile Iron Pipe FittingsInvesting into Business of Ductile Iron Pipe Fittings

 

Casting Read More

Capacity : 12 MT per Day
Plant and Machinery cost: 311.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.83%
Break Even Point (BEP):55.20 %
TCI :0.00 Lakhs
Cost of Project : 1135.00Lakhs
Add To Inquiry Basket
Business of Disposable Safety Razors
Business of Disposable Safety Razors

 

The double-edged ... Read More

Capacity : Razor Blade for Safety Razors Pack of 5 pcs each: 57,600 Units per Day Steel Scrap: 500 Units per Da
Plant and Machinery cost: 393.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):57.75%
Break Even Point (BEP):28.02 %
TCI :0.00 Lakhs
Cost of Project : 815.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Biodegradable Plastic Bag... Biodegradable Plastic Bags (Per Bag 25 gms Size): 12 MT per day 28.00 1498.00
Manufacturing of Dextrose... 0 0.00 0.00
White Oats Processing 0 0.00 0.00
Manufacturing of Vermicom... 0 0.00 0.00
Maize and It’s By Product... Maize Starch: 50 MT per day Sorbitol : 8.5 MT per day Liquid Glucose: 8.5 MT per day Dextrose Monohy 26.00 6631.00
Manufacturing of Biomass ... 0 0.00 0.00
Manufacturing of Black Pe... 0 0.00 0.00
3 Star Hotel with 2 Banqu... Air conditioned Deluxe Rooms:32 Units per day Conference Hall, Meeting Rooms & Business Lounge:0.5 25.00 1014.00
Workshop for Motors of Lo... Repair & Maintenance Motors (100 KW):2 Units per day On Site Annual Maintenance Contract (AMC):0.8 U 30.00 76.00
PVC Wires and Cables PVC Coated Copper Wires (100 Mtrs Rolls):33,784 Nos. per annum PVC Coated Aluminium Wires (100 Mtrs 32.00 1568.00
Start your own industry o... 0 0.00 0.00
Start Profitable Surgical... 0 0.00 0.00
Manufacturing of Disposa... 0 0.00 0.00
Ayurvedic Herbal Hand San... 1 0.00 0.00
Liquid Hand Wash 0 0.00 0.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
12345678910...
« Back1 2 3 4 5Next »

Showing 1 - 60 of 2823 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR